One of the items that is most overlooked is construction observation by the fountain consultant during the process of building the project. We encourage our continued involvement during construction to determine that the work is proceeding as designed and is of the quality required for the longevity of the fountain. We suggest visits to the site for critical phase inspections including the following:
- Piping and hardware inspection prior to backfilling or pouring concrete.
- Inspection of equipment space layout during construction.
- Inspection of finishes.
- Final commissioning.