• Skip to primary navigation
  • Skip to content
  • Skip to primary sidebar
  • Skip to footer
Waterline Studios logo
  • Home
  • Quals
    • Philosophy
    • Design Services
      • Design Coordination
      • Waterproofing
      • Conceptual Design
      • Design Development
      • Construction Documentation
      • Construction Observation
    • Download a Quals Package
  • Portfolio
  • Renovation
  • Blog
  • Ask a Question
  • Resources
  • Contact

Construction Observation

One of the items that is most overlooked is construction observation by the fountain consultant during the process of building the project. We encourage our continued involvement during construction to determine that the work is proceeding as designed and is of the quality required for the longevity of the fountain. We suggest visits to the site for critical phase inspections including the following:

  • Piping and hardware inspection prior to backfilling or pouring concrete.
  • Inspection of equipment space layout during construction.
  • Inspection of finishes.
  • Final commissioning.
Next: Download a Quals Package
« Previous Post
Next Post »

Primary Sidebar

Our Qualifications

  • Philosophy
  • Design Services
    • Design Coordination
    • Waterproofing
    • Conceptual Design
    • Design Development
    • Construction Documentation
    • Construction Observation
  • Download a Quals Package

Footer

Waterline Studios Inc.
1326 C Hwy 290 West, Dripping Springs, TX 78620

(512) 829-4391 Email Us

© 2023 Waterline Studios Inc. All rights reserved. Privacy Policy.